高强度结构沥青料未来三年高速成长 |
发布者:admin 发布时间:2012-5-31 8:14:27 点击:2748 |
高强度结构沥青料未来三年高速成长,行业新闻报道:订单饱满确保未来三年高速成长:沥青库宝利沥青*向湖南高速建设的2012 年拟通车的大浏、通平、浏醴、郴宁、衡桂、南岳高速等六条高速公路供应所需的重交沥青、改性沥青、抗车辙剂等沥青材料,其中重交沥青65,977吨,改性沥青168,524 吨,总计234,501 吨。国务院日前正式批复同意*发改委组织编制的《西部大开发“十二五”规划》,将优先发展基础设施建设,新疆、四川、河南、陕西、甘肃、青海等地未来几年将迎来高速公路的大发展。 The full order to ensure that the next three years high speed grows: asphalt base Baoli asphalt [7.910.00%] exclusive to Hunan high speed construction in 2012 to open big Liu, Ping, Liu Li, Chen Ning, Henggui, the high speed six freeways such as the supply of required heavy traffic asphalt, modified asphalt, asphalt anti rutting agent heavy traffic asphalt material, of which65977 tons,168524 tons of modified asphalt, a total of 234501 tons. Formal approval of the State Council recently agreed to the national development and Reform Commission to organize a work out" western big development" Twelfth Five" planning", will give priority to the development of infrastructure construction, Xinjiang, Sichuan, Henan, Shaanxi, Gansu, Qinghai, the next few years will usher in the development of the speedway. The company will rely on the Shaanxi Baoli, Xinjiang Baoli Baoli, Sichuan subsidiaries develop western highway construction asphalt to promote new products or bring the broader market: high strength structure of asphalt and asphalt by calculating the proportion is used, its market demand for asphalt market demand of a certain proportion, expected the domestic market potential demand will reach 1040000 tons to 1200000tons. Company 20000 tons / year of high strength structural asphalt project in 2011December complete. Waste rubber modified asphalt for China's recycling of discarded tires, waste plastics, reduce highway to build cost and large-scale application of waste rubber modified asphalt to lay a solid foundation, the company 's main rivals have yet to master factory production of waste rubber modified asphalt technology, only production equipment will be moved to the highway engineering field and asphalt base butt, to produce the products must be used in a short time, or delamination, segregation, and small batch, batch number, can not be ensured of each batch of product quality, more detrimental to the arrangement of project progress. Company 100000 tons / year of waste rubber modified asphalt material project is planned to be completed in June2012 plan。(图/文http://www.wxfengli.com/) |
上一页:深入研究*战略政策加强对新农村建设 下一页:浅谈直热沥青加温罐工艺 |